Two-storey new build
Ground up: groundworks, blockwork, roof and glazing, through to a finished front.
Home › Past work
Real jobs, filtered by trade. Hover or tap through each one to see it go from dug out, to mid-build, to finished.



Ground up: groundworks, blockwork, roof and glazing, through to a finished front.



Rendered, glazed and the ground outside laid to slabs up to the doors.



Frame craned in, panels set out, insulated and boarded.



Trusses set and the roof structure formed over the new build.



Extension built, rendered and finished with a new door and side access made good.



Steel frame erected, then timber rafters over it to form the canopy.



Beam set in and joists hung off it to carry the opening.



Trenched out, pipework laid and connected, then backfilled.



Services run in, ground levelled and the slab area prepared.


Shuttering set and the retaining wall poured.


Overgrown ground cleared and levelled ready to work on.



Dug out, sub-base laid, edged and block paved up to a new porch.



Front dug out and re-laid, with the path and edging made good.



Slabs laid to a fall with lighting run in as it went down.



Opening formed for the doors, then the patio laid right up to them.



Built from footings up, roofed, and finished with a door and window.


Brick garage with a roller shutter and the drive made good up to it.



Brickwork up, capped and rendered to match the house.



Stripped, re-laid and the ridge re-bedded.


Ridge re-bedded and the roof made good over the extension.



Extension opened up, plastered, then the kitchen fitted and finished.



Walls and ceilings plastered out ready for decorating.


Cylinder and boiler set, and the underfloor heating manifold run in.

Gable built and the glazing set into it.



Footings dug and poured, then the frame craned in over them.


Frame set out and bolted up ready for the roof structure.



Garden taken up, levelled and the paths and patio re-laid.



Overgrown plot cleared, levelled and edged ready to build on.



Wall built along the frontage with the drive made good up to it.



Scaffold up, roof stripped and made good front and back.



Rear extension rendered out and the side passage finished.



Taken back, first fix run in, then plastered ready for decorating.



Feature wall formed and the hallway plastered out.


Sub-base compacted and edgings set before the surface went down.

Garage finished off with the door hung and the surround made good.